Prepare the construction pit and guide the pipeline used to place the concrete mix underwater in a process called tremie. Ensure a continuous flow of concrete to avoid water going up the pipeline.
Data Source: Unified Global Standards (ISCED, ISCO, O*NET, ESCO)