Prepare the construction pit and guide the pipeline used to place the concrete mix underwater in a process called tremie. Ensure a continuous flow of concrete to avoid water going up the pipeline.
DATA SOURCED FROM ESCO (EUROPEAN COMMISSION) & O*NET (U.S. DEPARTMENT OF LABOR)